How to make the most of solar energy as an EV owner
11 April 2024How long does it take to charge my EV?
16 April 2024Standard vs non-standard EV charger installation
An EV charger installation at home is a relatively simple operation for a professional electrician.
However, there are two different ways in which this can be fulfilled—a standard and non-standard installation. While both achieve the same result, which is that your EV charger is fitted and ready to fuel your electric car whenever you need it, a non-standard installation will involve some additional site preparation work.
If you’re planning to install an EV charger at home (and “yay!” to you if you are—your life’s about to get a lot easier!), read on so that you’ll be fully clued into what to expect whether your installation is standard or non-standard.
What is an EV charger standard installation?
A standard installation is when your charger can be fitted without any additional work needing to be carried out. This kind of installation covers approximately 80 per cent of all installations in the UK.
To qualify for a standard installation there are a few boxes that you must be able to tick. They are:
- You need to own the property where the installation is to be carried out or have official permission for the work from your landlord.
- You must have a secure Wi-Fi connection with a strong signal at the location where you want the EV charger to be installed. This is easy for you to check by simply walking to the location with your mobile and checking the strength of the wifi there. Having secure Wi-Fi is important as you’ll need to connect your charger to a central server through its accompanying app. Doing so will enable features such as modifying the rate at which your EV charges, and keeping track of energy usage.
- You also need to have private off-street parking—i.e. a garage or driveway. If you live in an apartment, this will entail having your own parking space.
- It’s imperative to confirm that your home’s electrical infrastructure can handle the addition of an EV charger. The majority of 230-volt Level 2 chargers will need a dedicated circuit with at least 40 amps supply, and the existing installation will need to conform to current electrical standards.
What to expect in a standard EV charger installation
Don’t worry if you’re not sure how to confirm all of the above. All installers will carry out a comprehensive home assessment, usually online, to ensure that your home’s digital i’s are dotted and t’s crossed (if they don’t, make like Ariane Grande and say a polite, “Thank you. NEXT!”)
Once you are signed off on the above criteria, the standard EV charger installation can begin.
Just to be clear, only a certified electrician can complete your installation. Yep, your ability to change light bulbs in every room may be impressive to you but sorry to say, it doesn’t count here!
Standard installation packages
Once you buy a charger, you’ll often have to look separately for an installer. The more convenient—and cost-effective—option might be to look for a company that’ll offer a standard installation as part of the package when you buy their charger. For instance, purchasing the solar-ready VCHRGD Seven Pro charger from Powerverse comes with standard installation included, carried out by professional accredited installers.
All standard installations follow a series of specific steps. They are:
- The fitting of your EV charger on a permanent structure such as a brick or plaster wall.
- The charging cable will be routed via a drilled hole up to 500 mm (20 in) when necessary. Routing this cable won’t involve drilling through more than two walls (if it does, you’ll need a non-standard installation).
- A maximum of 15m of power cable and communications cable will be run and neatly secured directly to the wall between the fusebox or electricity supply meter and the charger.
- The supply connection point, which could be the fuse board (also known as the consumer unit) or supplier energy meter, won’t be located further than 15 metres from the proposed charger location.
- Three metres of plastic trunking will be used if necessary to conceal the internal wiring, with up to two directional changes.
- For your peace of mind, our standard installation also includes a Type 2 Surge Protection Device (SPD). This device safeguards your EV charger and vehicle from potential voltage surges at your property.
- In addition to the SPD, we also install as standard the necessary circuit protection devices when they are not already available. These are normally housed in a small separate fuse box dedicated to the EV charging installation.
- The assumed installation time would be less than 3-4 hours.
- Once everything has been installed, the electrician will test it and you’ll receive an EIC (Electrical Installation Certificate) from your installer.
What is a non-standard EV charger installation?
A non-standard installation means that additional work is needed to prepare your electrical system for a home car charger installation. For example:
The fuse box is not a trip switch type
This is less likely to result in a nonstandard installation as we normally install a new dedicated fuse box for the connection of the EV charger and its circuit. But should we need to connect to the existing one, it’s important that the fuses in your primary fuse box, or board, are trip switch types.
Each switch on the fuse board is linked to different circuits around the home.
When too much electrical current passes through a given circuit, the switch will “trip” to break the circuit, immediately stopping the flow of the current.
If the fuse box is not a trip switch type, it may need to be upgraded in line with the UK’s Electrical Safety Standards before the charger installation.
Your installer can provide further guidance here as there may be alternative options. Make sure to speak with them before agreeing to work with a 3rd party and, as this is an additional cost to your EV home charger installation, ensure you get a few different quotes to find a competitive price. For less headache, your installers may be able to provide a quote and have the fuse box replaced as part of the installation.
Upgrading your Supply Fuse
Powerverse charger installations come with load management as standard, so as long as we can install the load management equipment, we will be able to install your charger. However, the output of the charger may be affected should you switch on a lot of power-hungry appliances at the same time! This is because the load management is designed to protect your supply and the supply fuse by derating the charger if necessary.
Most modern homes have a 100 amp supply but some older or smaller-sized homes have only 80 to 60 amps. If this is the case (and you can ask your electrician to check if you’re not sure), and your existing energy consumption is high to the extent it could interfere with your EV charging, you may need to replace your supply fuse. This ensures you’ll have adequate power to charge your electric car at home without any issues.
This is a job that your local Distribution Network Operator (DNO) will have to carry out. The good news is that in most cases they’ll do it for free.
A DNO owns and operates the electric power distribution system in your area and, depending on where you live, it could be National Grid, SP Energy Networks, UK Power Networks, Scottish and Southern Electricity Networks (SSEN), Electricity North West, Northern Powergrid, etc.
If you’re unsure who your DNO is, you can find out by entering your postcode via the Energy Networks Association website.
Your existing electrical installation does not have the water, gas or oil pipes “Earth Bonded”
One of the requirements of electrical regulations is that any metallic pipes entering a home from outside the property must be connected to the same earthing system as the electrical supply.
This is called “earth bonding” and it ensures everything metallic in your home is at the same “earth potential”. If it’s not, and should there ever be an electrical fault, it can be quite serious!
That’s why all electrical installations cannot be signed off by a qualified electrician as compliant unless this has been completed.
Don’t worry, this is not a new rule, so it’s likely that your home already has those pipes earth-bonded, or that the pipes are plastic so it’s not required. But if they are metallic i.e. copper, and are not connected, work will need to be done to get them compliant before or during the EV charger installation. Your installer will be able to support you with this.
Your meter does not have an isolation switch
If your energy meter is missing an isolation switch you’ll need to request one from your energy supplier. This is crucial because to securely install your new EV charger, an electrician must be able to turn off the electrical circuit.
You may hear from some installation companies that it’s ok to remove the supply fuse to achieve the same effect. However, this can be extremely dangerous, not to mention be classed as tampering with the supply which could result in a knock on the door from your supplier!
So, the good news is that an isolation switch will usually be installed at no cost to you by your energy provider!
Your home is on a looped cable system
When two or more properties share a single electrical cable, it is known as a looping supply cable.
You can easily check for yourself whether this is the system you have—It will generally appear as two cables entering the bottom of your cut-out (i.e. fuse holder), which is situated below the fuse.
If your home is a terraced or semi-detached house, it’s more likely this is the cable system it has, and it’ll need to be replaced.
Once again you must get in touch with your local Distribution Network Operator (DNO) for this job, which they’ll carry out for free.
The cable route from meter to chargepoint is longer than 15 metres
If a greater distance of cabling is needed to install your EV charger then this is going to incur additional fees. This is not just because more manpower will be needed (though that is a consideration). It’s also because the installer will need to use different cables with a higher diameter (i.e. the distance from one side of the cable to the other), and these will need to be adapted to your home.
The cable toute involves drilling through more than two walls
A standard EV charger installation typically takes no longer than 2-3 hours and these labour costs are included in the overall package price.
However, if installers have to drill through more than two walls to route the cable from meter to charger, then the price will be increased. This makes sense: Not only will the job take longer, but it will be more complex and likely necessitate longer cable.
Generally, then, having to drill through more than two walls to route the cable properly will fall under a non-standard installation. As the homeowner, you’ll have to pay for this to be carried out separately from the standard installation.
The cable route needs to go underground
When the cable route has some sections that need to go underground or be buried, the work is much more involved than the standard clipping of the cable to the wall. Normally a third party contractor will need to be involved to safely complete the ground works and ensure the cable is at the correct depths. The cable used will also be different to what is included as standard as it’ll need to be much tougher to withstand the stresses and likelihood of impact. Your installer can provide more guidance on what would be required.
Final words
A non-standard EV charger installation will involve more preparation for the final installation, but all of the above work will rarely need to be carried out. Most homes having an EV charger fitted will undergo a standard installation.
If you want to find out more about standard installations, feel free to contact the team at Powerverse. We’re always happy to answer questions and explain exactly how our simple, seamless and super-fast installation process works.